约搏以太坊:Pansar eyes key role in state development
Pansar's chairman, Datuk James Tai Cheong, said Pansar aims to play a role in the state infrastructure development via projects such as the Sarawak Second Trunk Road project, upgrading of state coastal roads, road linkages to villages, water supply grid programme, rural electrification as well as telecommunication infrastructure projects.皇冠信用网app(www.hg108.vip)是一个开放皇冠信用网代理APP下载、皇冠信用网会员APP下载、皇冠信用网线路APP下载、皇冠信用网登录APP下载的皇冠正网平台。皇冠信用网APP上最新登录线路、新2皇冠信用网更新最快。皇冠信用网APP开放皇冠信用网会员注册、皇冠信用网代理开户等业务。
KUCHING: Pansar Bhd is eyeing more key infrastructure projects listed by the Sarawak government in its Post Covid-19 Development Strategy 2030 (PCDS 2030).
Its chairman, Datuk James Tai Cheong, said Pansar aims to play a role in the state infrastructure development via projects such as the Sarawak Second Trunk Road project, upgrading of state coastal roads, road linkages to villages, water supply grid programme, rural electrification as well as telecommunication infrastructure projects.
Among the initiatives and major projects planned under PCDS 2030 that were highlighted by Sarawak Premier Datuk Patinggi Abang Johari Tun Openg at its launch in July 2021 are the development of autonomous rail rapid transit Kuching Urban Transportation System (estimated cost of more than RM5bil), expansion of terminals at the Kuching and Sibu Airports and new deep sea ports at Kuching and northern Sarawak.
The new key industrial projects include the development of Petrochemical Hub and bio-industrial park in Bintulu, which is currently underway, as well as free industrial zones around the new deep sea ports as well as a furniture park and extension of the Samajaya Hi-Tech Park.
To support the industrial development, a Pan Sarawak gas pipeline will also be built.
The PCDS 2030 has seven strategic thrusts and is anchored on six economic sectors as the main engines of growth, which will be supported by seven enablers.
,,约搏以太坊(www.eth108.vip)采用以太坊区块链高度哈希值作为统计数据,约搏以太坊游戏数据开源、公平、无任何作弊可能性。
Tai said Pansar is currently constructing the Batang Lupar bridge, the longest riverine bridge in Malaysia, in Samarahan Division.
The Batang Lupar bridge, with a contract value of RM848.8mil, is one of the nine major bridges to be built under the Sarawak coastal road network which stretches a massive 896km. Several other bridges are also in various stages of construction
The on-going 225km Second Trunk Road project will become an alternative road to the Sarawak Coastal Road and Pan Borneo Highway network which will significantly shorten the travelling time from Kota Samarahan to Sibu.
Most of the work packages under Pan Borneo Highway Sarawak are due for completion this year.
Tai said other notable infrastructure projects Pansar is implementing now are the Universiti Malaysia Sarawak Teaching Hospital (worth RM486mil), mechanical and engineering works on the Shell Headquarters in Miri and retrofitting of the Sarawak Timber Industry Development Corp building in Kuching.
Pansar’s total order book for these projects (including Batang Lupar bridge) is RM1.4bil.
网友评论
蹲街、想着迩
回复"We expect further volatility in risky sectors such as technology amid the rebalancing activities.还是熟悉的感觉
足球分析(www.99cx.vip)
回复@蹲街、想着迩 妙不可言啊啊
澳洲5彩票开奖网(www.a55555.net)
回复休息会再看
遊赱丗間の薄情亽
回复@澳洲5彩票开奖网(www.a55555.net) 我真觉得可以更好
智障儿童欢乐多
回复The world's second-largest palm oil producer lacks at least 1.2 million workers across its plantation, manufacturing, and construction sectors, a shortage worsening daily as economic activity rebounds from the pandemic.角度清奇,篇幅精悍